|
The Flow chart window lets you view the internal steps within a Job. There are many ways to control the flow between Tasks. The Flow charts shows Triggers, Conditions, Tasks and Notifications.
Flow chart
Job selection
In the first select box you select which Job you would like to view.
Refresh button
Refreshes the current view
Show/Hide objects
In this menu you can uncheck/check which objects (Triggers, Conditions, Notifications, On error) the chart should show.
Show grid
Enables or disables the background grid.
Print preview
Shows the print preview window.
Page setup
Shows the page setup window.
Select printer
Shows the printer selection window.
Flow chart
The chart window contains the objects that is displayed in the left area. In top left of the flow chart the flow arrows are described. A flow chart is drawn from top to bottom.
* you can edit an object by double clicking on it * you can hide a specific object type by right clicking on it and choose hide * you can hover over each object (and arrows) to see detail |