The Flow chart window lets you view the internal steps within a Job. There are many ways to control the flow between Tasks. The Flow charts shows Triggers, Conditions, Tasks and Notifications.

 

clip1014

 

Flow chart

 

Job selection

 

In the first select box you select which Job you would like to view.

 

Refresh button

 

Refreshes the current view

 

Show/Hide objects

 

In this menu you can uncheck/check which objects (Triggers, Conditions, Notifications, On error) the chart should show.

 

Show grid

 

Enables or disables the background grid.

 

Print preview

 

Shows the print preview window.

 

Page setup

 

Shows the page setup window.

 

Select printer

 

Shows the printer selection window.

 

Flow chart

 

The chart window contains the objects that is displayed in the left area. In top left of the flow chart the flow arrows are described. A flow chart is drawn from top to bottom.

 

* you can edit an object by double clicking on it

* you can hide a specific object type by right clicking on it and choose hide

* you can hover over each object (and arrows) to see detail