michaelhum
2016-11-08T22:55:09Z
I have a dozen PCs configured with Visualcron. Looking to configure two PCs which would act as the "master" job schedulers. The two PCs would start jobs on the other dozen PCs.
Has anyone figured out a way to determine which PC to start a job on, based on resources? Meaning if PC1 has 5 jobs running and PC 2 has 3 jobs running, the next job would be started on PC 2. Resources can be calculated by, number of job running, available CPU, memory...etc etc. This could be a Visualcron "trigger" to check the resources on a PCs.

If this is not currently possible with Visualcron, I'd like to make a request for this type of "load balancing" capability be included in a future release.