VisualCron is an Automation, Integration and Task Scheduling Tool for Windows.
Henrik,Can I achieve a similar functionality by kicking off a job/task from another job using the Job/Task Control task type?Then can I set different values for the variables at the job control task level and another set of values for the same variables at the job level?E.g.Job A (set values for a set of variables) Job/Task Control Task (pointing to Job B and Task B1) (set different values for the same set of variables)Can I do this?Thanks.
© VisualCron