Hi,
I checked out the option, specifically scheduling the option.   And, pleasantly surprised, scheduling the option allows for out put to a .CSV file!.    All that is missing is the ability to show all job runs from period X to X.   (closest option is Next Run).    Could there be some consideration to put a  "All jobs runs from period X to X" as an option?