Community forum

Please note that VisualCron support is not actively monitoring this community forum. Please use our contact page for contacting the VisualCron support directly.


Support
2010-05-10T12:04:27Z
Changes in 5.5.9

[FEATURE] Client/Server: Added optional event log logging of server events
[FEATURE] Client/Server: Added Tasks to Active Job node in Variables
[FEATURE] Client/Server: Added support for paranthesis () in Variables
[BUGFIX] Client: Fixed an error when trying to import certificates in the Manage Certificates window
[BUGFIX] Client: Fixed a display problem of the new work day Trigger from last version
[BUGFIX] Server: Fixed a problem with translating Variable to constant in Set Variable Task
[BUGFIX] Server: Fixed some issues with PrevTask combinations with the new result Variables from FTP and Copy file Task
[BUGFIX] Server: Fixed a Variable problem with SFTP change folder Task

If you have installed 5.5.x from before and get an uninstall error about event log then please download and run the second attachment before uninstalling.
File Attachment(s):
EventLogCleanup.zip (2kb) downloaded 70 time(s).

Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
Sponsor
Forum information
ErikC
2010-05-11T08:04:42Z
I was upgrading from 5.5.8 on a Windows server 2003 and had not trouble upgrading.

Was hoping to see the Sharepoint upload/delete functionality..😊 but hey.. patience is a good characteristic.

Regards,
Erik
Uses Visualcron since 2006.
ErikC
2010-05-11T10:00:09Z
In the FTP/SSH/Terminal Explorer I'm connecting to an SFTP site, but due to network problems I can not connect. It gives me a Connection failed (error code is 10060) which is a timeout error.

In the statusbar however I see: "Connected to [ftpservername] (IP number)"

That's not true, connection failed.

Regards,
Erik
Uses Visualcron since 2006.
ErikC
2010-05-12T14:19:46Z
String.TrimEnd Variable

URL:
String.TrimEnd 

Thanks PeterW😎

Regards
Erik
Uses Visualcron since 2006.
ErikC
2010-05-14T14:38:10Z
Support wrote:

[FEATURE] Client/Server: Added Tasks to Active Job node in Variables


When I want to add a condition to a task and open the variables than the active tasks are empty.

Reproduce:
- Open existing task
- go to conditions tab
- add new condition
- click on variables
- check the visualcron tasks: empty

It looks like the conditions window is separated from the task so it has no link, but I went to this window from a existing task. I expect to see my active tasks in the variables.


There is also no arrow in front of the current job.

Regards,
Erik

Uses Visualcron since 2006.
Support
2010-05-19T13:38:06Z
Yes, this is a known one. We have added this to future to do as it is not "critical". Thanks for the report.

ErikC wrote:

Support wrote:

[FEATURE] Client/Server: Added Tasks to Active Job node in Variables


When I want to add a condition to a task and open the variables than the active tasks are empty.

Reproduce:
- Open existing task
- go to conditions tab
- add new condition
- click on variables
- check the visualcron tasks: empty

It looks like the conditions window is separated from the task so it has no link, but I went to this window from a existing task. I expect to see my active tasks in the variables.


There is also no arrow in front of the current job.

Regards,
Erik



Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
Scroll to Top