Community forum

Please note that VisualCron support is not actively monitoring this community forum. Please use our contact page for contacting the VisualCron support directly.


grendel70
2013-12-18T22:17:50Z
I am on version 7.0.7 and am making use of the Flow feature of tasks to perform some action control. I have a job setup and working fine but run into problems when I clone it. In the cloned copy, the Goto Task setting within the Flow tab is empty even though the description kept the original value. As a result, I have to manually reset it to the task that's desired.

Seeing as I have 4 or 5 manual flow controls and I need to clone the job 100+ times, this is going to be a grind to have to reset in each clone.

Is this a known bug? Is there a fix in a newer version?
Sponsor
Forum information
Support
2013-12-19T09:06:20Z
Thanks for the report - this one was new. We have fixed this now for the upcoming version. Hopefully a beta will be released before the weekend.
Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
grendel70
2013-12-19T19:25:59Z
On a related note, the same Job has a leading Job/Task control Task. When cloned, the Tasks choice is cleared and has to be manually reset.
Support
2013-12-19T21:46:54Z
Originally Posted by: grendel70 

On a related note, the same Job has a leading Job/Task control Task. When cloned, the Tasks choice is cleared and has to be manually reset.



Thanks, we have fixed this as well. You will not see this directly when editing the Task from new cloned window (because the Job and Task is not created yet) but next time you open the Task from Task row or Job row. So, if you clone and save it will be alright (in the new version).
Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
grendel70
2013-12-19T21:53:21Z
Great. What release will have these fixes?
Support
2013-12-19T22:18:54Z
Originally Posted by: grendel70 

Great. What release will have these fixes?



Not sure of the version number, if it will be 7.0.9 or 7.1.0 but it will be the next version.
Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
grendel70
2013-12-27T17:03:36Z
Installed 7.0.9 beta.

Task settings in Flows now persist within the cloned Job.

The Task setting on a Job/Task Control Task is still cleared. I clone the job, rename it, reopen it, inspect the Job/Task Control task - the task setting (which normally just points to the 2nd task in the job) is unset.
Support
2013-12-27T18:19:32Z
Originally Posted by: grendel70 

Installed 7.0.9 beta.

Task settings in Flows now persist within the cloned Job.

The Task setting on a Job/Task Control Task is still cleared. I clone the job, rename it, reopen it, inspect the Job/Task Control task - the task setting (which normally just points to the 2nd task in the job) is unset.



See post #4. We have some limitations here so you need to save the Job first.
Henrik
Support
http://www.visualcron.com 
Please like  VisualCron on facebook!
grendel70
2013-12-27T18:49:20Z
Yes, I clone the job, rename it and save. I reopen the job, inspect Job/Task Control task and the task setting is unset. This isn't as critical since I need to customize the job variables anyway and it's just an extra click on that task. Getting the patch on the flow unsets was a far bigger concern and that's working great now.